Project Experience

Built with Integrity

Burnaby Central Secondary School

Burnaby Central Secondary School 
This school follows a ‘P2’ Design-Build process awarded through a competition.  The school is sited to relate to the urban context, opposite Burnaby City Hall. Community components include an International Standard athletic track and a community meeting hall. The project is a LEED® Gold Candidate. Sustainable features: Energy efficiency (40% better than Code); a geoexchange closed loop heating/cooling system; a weather-regulated irrigation system; durable construction; recycled & regional materials; construction waste management; riparian area restoration; and water-efficient plumbing. School is designed for 1500 students at approx. 150,000 sq. ft.

Back